Hidden Image

Document Library

 

Donec rutrum varius orci, eget consectetur orci egestas vel. Suspendisse nunc enim, viverra at tristique in, cursus at nisi. Vivamus sit amet risus quis nibh blandit elementum. Duis et volutpat eros. Morbi tempor ullamcorper neque quis mollis. Ut malesuada pharetra dui quis laoreet. Aenean congue neque et magna faucibus id gravida diam imperdiet.

Some linked content may require an external reader, download: Free Microsoft Apps (Word, Excel, PowerPoint) and Free Adobe PDF Reader

Program Options

{[accordion:Options]}

Snapshot

Through the Snapshot service, Providers in NYSERDA’s Multifamily Provider Network can request a free weather-normalized energy usage report for a multifamily building that is participating in MPP.

Experienced professionals build the Snapshot report by applying tested, trusted industry best practices to actual electricity and gas usage data straight from the utilities. The Snapshot Report saves you money and time, and gives you the most reliable starting point possible.

{[accordion:Snap]}

Marketing

{[accordion:MarketingResources]}

Technical Resources

{[accordion:TechRes]} {[accordion:LegacyFiles]}

Comprehensive Option V7

Application

  • W-9 | PDF
    Uploaded: 5/12/2016

  • Electronic Funds Transfer (EFT) Form | PDF
    Uploaded: 5/12/2016

  • Resident Income Certification Form | MS-Word
    Uploaded: 5/12/2016

  • MPP V7 Comprehensive Option Terms & Conditions  | PDF
    Uploaded: 5/13/2016

  • Affordable Rent Roll Tool  | Excel
    Uploaded: 1/20/2017

Construction

  • Construction Management and 50% Complete | MS-Excel
    Uploaded: 11/21/2017
    Construction Management and 50% Complete workbook

  • Scope Change Memo | MS-Word
    Uploaded: 1/2/2018
    Use this memo template if submitting a scope change.

Savings Verification and Information Tool

  • MPP V7 SAV-IT Tool | MS Excel
    Uploaded: 5/13/2016

    Photo Documentation Template | MS-Word
    Uploaded: 1/2/2018
    Optional, but recommended template used to submit required photo documentation.

Guidelines

  • MPP V7 Comprehensive Option Guidelines | PDF
    Uploaded: 5/12/2016

 

Comprehensive Option V8

Application

  • W-9 | PDF
    Uploaded: 5/12/2016

  • Electronic Funds Transfer (EFT) Form | PDF
    Uploaded: 5/12/2016

  • Resident Income Certification Form | MS-Word
    Uploaded: 5/12/2016

  • MPP V7 Comprehensive Option Terms & Conditions  | PDF
    Uploaded: 5/13/2016

  • Affordable Rent Roll Tool  | Excel
    Uploaded: 1/20/2017

Construction

  • Construction Management and 50% Complete | MS-Excel
    Uploaded: 11/21/2017
    Construction Management and 50% Complete workbook

  • Scope Change Memo | MS-Word
    Uploaded: 1/2/2018
    Use this memo template if submitting a scope change.

Savings Verification and Information Tool

  • MPP V7 SAV-IT Tool | MS Excel
    Uploaded: 5/13/2016

  • Photo Documentation Template | MS-Word
    Uploaded: 1/2/2018
    Optional, but recommended template used to submit required photo documentation.

Guidelines

  • MPP V7 Comprehensive Option Guidelines | PDF
    Uploaded: 5/12/2016

 

High Performance V8

Application

  • W-9 | PDF
    Uploaded: 5/12/2016

  • Electronic Funds Transfer (EFT) Form | PDF
    Uploaded: 5/12/2016

  • Resident Income Certification Form | MS-Word
    Uploaded: 5/12/2016

  • MPP V7 Comprehensive Option Terms & Conditions  | PDF
    Uploaded: 5/13/2016

  • Affordable Rent Roll Tool  | Excel
    Uploaded: 1/20/2017

Construction

  • Construction Management and 50% Complete | MS-Excel
    Uploaded: 11/21/2017
    Construction Management and 50% Complete workbook

  • Scope Change Memo | MS-Word
    Uploaded: 1/2/2018
    Use this memo template if submitting a scope change.

Savings Verification and Information Tool

  • MPP V7 SAV-IT Tool | MS Excel
    Uploaded: 5/13/2016

    Photo Documentation Template | MS-Word
    Uploaded: 1/2/2018
    Optional, but recommended template used to submit required photo documentation.

Guidelines

  • MPP V7 Comprehensive Option Guidelines | PDF
    Uploaded: 5/12/2016

 

Data Release Authorization Form

Application

  • DRAF - Resident | PDF
    Uploaded: 5/12/2016

  • DRAF - Owner| PDF
    Uploaded: 5/12/2016
    This Owner DRAF allows NYSERDA to pull customer data for 10 years after program participation. It includes language that supersedes the data pull timelines in the Terms and Conditions form.  

Administration

Application

  • MPP Fact Sheet | PDF
    Uploaded: 8/16/2018
    Give this fact sheet to your potential clients so they can understand what MPP offers.

 

Administration

  • W-9 | PDF
    Uploaded: 5/12/2016

  • Electronic Funds Transfer (EFT) Form | PDF
    Uploaded: 5/12/2016

  • Resident Income Certification Form | MS-Word
    Uploaded: 5/12/2016

  • MPP V7 Comprehensive Option Terms & Conditions  | PDF
    Uploaded: 5/13/2016

  • Affordable Rent Roll Tool  | Excel
    Uploaded: 1/20/2017

 

Building Envelope

  • W-9 | PDF
    Uploaded: 5/12/2016

  • Electronic Funds Transfer (EFT) Form | PDF
    Uploaded: 5/12/2016

  • Resident Income Certification Form | MS-Word
    Uploaded: 5/12/2016

  • MPP V7 Comprehensive Option Terms & Conditions  | PDF
    Uploaded: 5/13/2016

  • Affordable Rent Roll Tool  | Excel
    Uploaded: 1/20/2017

Case Studies

  • W-9 | PDF
    Uploaded: 5/12/2016

Domestic Hot Water

  • W-9 | PDF
    Uploaded: 5/12/2016

  • Electronic Funds Transfer (EFT) Form | PDF
    Uploaded: 5/12/2016

HVAC

  • W-9 | PDF
    Uploaded: 5/12/2016

  • Electronic Funds Transfer (EFT) Form | PDF
    Uploaded: 5/12/2016

  • Resident Income Certification Form | MS-Word
    Uploaded: 5/12/2016

  • MPP V7 Comprehensive Option Terms & Conditions  | PDF
    Uploaded: 5/13/2016

  • Affordable Rent Roll Tool  | Excel
    Uploaded: 1/20/2017

Modeling and Utility Data

  • W-9 | PDF
    Uploaded: 5/12/2016

  • Electronic Funds Transfer (EFT) Form | PDF
    Uploaded: 5/12/2016

  • Resident Income Certification Form | MS-Word
    Uploaded: 5/12/2016

  • MPP V7 Comprehensive Option Terms & Conditions  | PDF
    Uploaded: 5/13/2016

  • Affordable Rent Roll Tool  | Excel
    Uploaded: 1/20/2017

Construction

  • Construction Management and 50% Complete | MS-Excel
    Uploaded: 11/21/2017
    Construction Management and 50% Complete workbook

  • Scope Change Memo | MS-Word
    Uploaded: 1/2/2018
    Use this memo template if submitting a scope change.

Miscellaneous

  • W-9 | PDF
    Uploaded: 5/12/2016

Tools and Calculators

Modeling and Utility Data

  • W-9 | PDF
    Uploaded: 5/12/2016

  • Electronic Funds Transfer (EFT) Form | PDF
    Uploaded: 5/12/2016

  • Resident Income Certification Form | MS-Word
    Uploaded: 5/12/2016

  • MPP V7 Comprehensive Option Terms & Conditions  | PDF
    Uploaded: 5/13/2016

  • Affordable Rent Roll Tool  | Excel
    Uploaded: 1/20/2017

Model Calibration Tool Weather Data

  • W-9 | PDF
    Uploaded: 5/12/2016

  • Electronic Funds Transfer (EFT) Form | PDF
    Uploaded: 5/12/2016

  • Resident Income Certification Form | MS-Word
    Uploaded: 5/12/2016

  • MPP V7 Comprehensive Option Terms & Conditions  | PDF
    Uploaded: 5/13/2016

  • Affordable Rent Roll Tool  | Excel
    Uploaded: 1/20/2017

Legacy Files

Existing Buildings V6

Application

  • Terms & Conditions (NEW!) - (330.84 KB)
    Uploaded: 2/9/2015
  • W-9 - (257.20 KB)
    Uploaded: 12/3/2014
  • Project Information Form - (1.93 MB)
    Uploaded: 6/29/2015
    Project Information Form
  • Resident Income Certification Form - (678.50 KB)
    Uploaded: 6/29/2015
    Resident Income Certification Form
  • Affordable Rent Roll Tool - (243.50 KB)
    Uploaded: 6/29/2015
  • Electronic Funds Transfer (EFT) Form - (231.41 KB)
    Uploaded: 6/29/2015
  • Application Submittal Checklist - (706.50 KB)
    Uploaded: 8/14/2015
    Application Submittal Checklist

Energy Reduction Plan

  • ERP Tool Patch - (80.83 KB)
    Uploaded: 7/15/2015
    For use with V5.3 and V6.1 ERP Tool
  • Energy Reduction Plan V6.2 - (3.00 MB)
    Uploaded: 8/19/2015
    For us with Version 6 phase I and phase II projects.
  • Workscope Testing Environment V5 & V6 - (917.32 KB)
    Uploaded: 9/21/2015
    For ERP workscope testing only. Can be imported into the V6.2 ERP tool.
  • ERP Report Template V6 - (1.49 MB)
    Uploaded: 10/13/2015
  • Model Calibration Tool - (3.60 MB)
    Uploaded: 11/9/2015
    Used to true-up utility bill data for non-TREAT models.

Construction

  • Photo Template - (63.79 KB)
    Uploaded: 4/6/2015
  • Scope Change Requests - Updating the ERP Tool - (126.50 KB)
    Uploaded: 8/25/2015
    This guidance document provides instructions on updating all versions of the ERP Tool to accommodate changes to a project scope of work.
  • Scope Change Request - (660.50 KB)
    Uploaded: 8/25/2015
    Use this document to describe changes to the project's scope of work.
  • Site Inspection Workbook V6.2 - (896.28 KB)
    Uploaded: 10/13/2015
  • V5 and V6 Amendment - Updated Inspection Protocol Requirements - (424.57 KB)
    Uploaded: 7/25/2017

Guidelines

  • EB Simulation Guidelines V6 - (786.34 KB)
    Uploaded: 12/3/2014
  • Amendment to Program Guidelines V5 & V6 - (38.67 KB)
    Uploaded: 1/26/2015
  • EB Program Guidelines V6a - September 2015 - (1.36 MB)
    Uploaded: 9/22/2015
  • V5 and V6 Amendment - Updated Inspection Protocol Requirements - (424.57 KB)
    Uploaded: 7/25/2017
  • Data Release Authorization Forms
  • Utility Data Release Authorization Form - Owner - (317.79 KB)
    Uploaded: 7/9/2018
    This Owner DRAF allows NYSERDA to pull customer data for 10 years after program participation. It includes language that supersedes the data pull timelines in the Terms and Conditions form.
  • Utility Data Release Authorization Form - Tenant - (358.81 KB)
    Uploaded: 7/9/2018
    This release form is required for projects where utilities are direct metered to residents, and individual account data is used. This form is not applicable to projects using aggregated ConEd data pulls

Tools

  • NYS Weather Lookup 2015-6-10 - (5.06 MB)
    Uploaded: 6/16/2015
  • NYS Weather Data Lookup - (2.50 MB)
    Uploaded: 6/1/2016
    Updated through 5-15-2016
  • Model Calibration Tool Weather Data - (477.07 KB)
    Uploaded: 6/12/2018
    Weather data through 6/1/2018

 

Existing Buildings V5

Application

  • W-9 - (257.20 KB)
    Uploaded: 2/9/2015
  • Terms & Conditions - (134.26 KB)
    Uploaded: 2/9/2015
  • Application Submittal Checklist - EB V5 - (690.50 KB)
    Uploaded: 6/29/2015
  • Project Information From - (1.93 MB)
    Uploaded: 6/29/2015
    Use this to gather data about a project needed to submit an application.
  • Resident Income Certification Form - (678.50 KB)
    Uploaded: 6/29/2015
    Use this form to qualify for Affordable Status via Resident Income Certification
  • Affordable Rent Roll Tool - (243.50 KB)
    Uploaded: 6/29/2015
    Use this form to qualify for Affordable Status via Rent Roll
  • Electronic Funds Transfer (EFT) Form - (231.41 KB)
    Uploaded: 6/29/2015
    This form must be completed electronically. Hand-written forms (other than the signature line) will not be accepted by NYSERDA. So remember, type the form, then get it hand-signed.

Energy Reduction Plan

  • ERP Report Template V5.2 - (1.70 MB)
    Uploaded: 2/9/2015
    Issued November 2013
  • Photo Template (optional) - (461.27 KB)
    Uploaded: 2/9/2015
  • Workscope Testing Environment V5 & V6 - (917.32 KB)
    Uploaded: 9/21/2015
    For ERP workscope testing only. Can be imported into V5.3 and V6.2 ERP tools.
  • ERP Tool Patch - (80.83 KB)
    Uploaded: 9/21/2015
    For use with V5.3 and V6.1 ERP Tool
  • Energy Reduction Plan V5.3 - (3.58 MB)
    Uploaded: 9/21/2015
    For use with Version 5 projects only.
  • Model Calibration Tool - (3.60 MB)
    Uploaded: 5/3/2018
    Model Calibration Tool for non-TREAT models.

Construction

  • Photo Documentation Template (MS Word 97-2003) - (156.50 KB)
    Uploaded: 2/9/2015
  • Photo Documentation Template (MS Word 2010) - (63.79 KB)
    Uploaded: 2/9/2015
  • Scope Change Request - (660.50 KB)
    Uploaded: 6/29/2015
    Use this to document and request changes to the MPP scope of work. Be sure to include an updated ERP Tool showing the changes.
  • Scope Change Requests - Updating the ERP Tool - (126.50 KB)
    Uploaded: 8/25/2015
    This guidance document provides instructions on updating all versions of the ERP Tool to accommodate changes to a project scope of work.
  • Site Inspection Workbook V6.2 - (896.28 KB)
    Uploaded: 10/13/2015
    Use for Version 5 projects.
  • V5 and V6 Amendment - Updated Inspection Protocol Requirements - (424.57 KB)
    Uploaded: 7/25/2017

Stage 4

  • Performance Payment Worksheet - (94.00 KB)
    Uploaded: 1/29/2015
  • Sample Documents
  • Sample EFT Form - (81.59 KB)
    Uploaded: 2/9/2015
    Sample for demonstration purposes
  • Sample W-9 - (103.09 KB)
    Uploaded: 2/9/2015
    Sample for demonstration purposes
  • Sample Terms & Conditions - (1.25 MB)
    Uploaded: 2/9/2015
    Sample for demonstration purposes
  • Sample Scope Change Request - (158.00 KB)
    Uploaded: 2/9/2015
    Sample for demonstration purposes.
  • Sample Site Inspection request - (1.29 MB)
    Uploaded: 2/9/2015
    Sample for demonstration purposes.
  • Sample Photo Documentation - (6.02 MB)
    Uploaded: 2/9/2015
  • Sample Project Info Form - (153.85 KB)
    Uploaded: 6/29/2015
    Sample for demonstration purposes
  • Sample Affordable Rent Roll Tool - (245.50 KB)
    Uploaded: 6/29/2015
    Sample for demonstration purposes

Guidelines

  • Simulation Guidelines V5.2 - (1.52 MB)
    Uploaded: 2/9/2015
  • Amendment to Program Guidelines V5 & V6 - (38.67 KB)
    Uploaded: 1/26/2015
  • Program Guidelines V5.2 - (2.01 MB)
    Uploaded: 2/9/2015
    Updated November 2013
  • V5 and V6 Amendment - Updated Inspection Protocol Requirements - (424.57 KB)
    Uploaded: 7/25/2017
  • Data Release Authorization Forms
  • Utility Data Release Authorization Form - Tenant - (358.81 KB)
    Uploaded: 7/9/2018
    This release form is required for projects where utilities are direct metered to residents, and individual account data is used. This form is not applicable to projects using aggregated ConEd data pulls
  • Utility Data Release Authorization Form - Owner - (317.79 KB)
    Uploaded: 7/9/2018
    This Owner DRAF allows NYSERDA to pull customer data for 10 years after program participation. It includes language that supersedes the data pull timelines in the Terms and Conditions form.

Tools

  • NYS Weather Lookup 2014-6-30 - (4.57 MB)
    Uploaded: 2/9/2015
    Weather data through June 30, 2014.
  • Model Calibration Tool Weather Data - (477.07 KB)
    Uploaded: 6/12/2018
    Weather data through 6/1/2018

 

New Construction V6

Application

  • W-9 - (257.20 KB)
    Uploaded: 2/9/2015
  • NC Project Information Form - (102.93 KB)
    Uploaded: 2/9/2015
  • NC Eligibility Flowchart & Decision Trees - (166.51 KB)
    Uploaded: 2/9/2015
  • NC Application Submittal Checklist - (76.37 KB)
    Uploaded: 2/9/2015
  • Electronic Funds Transfer (EFT) Form - (223.60 KB)
    Uploaded: 4/2/2015
  • NC V6 Terms and Conditions - (173.04 KB)
    Uploaded: 10/12/2015
  • NC V6 Incentive Schedules - (10.25 KB)
    Uploaded: 10/12/2015
    Incentive schedules for New Construction V6.1 and V6.2.

Construction

  • NC Inspection Request Form - Sample 1 - (81.33 KB)
    Uploaded: 2/9/2015
  • NC Inspection Request Form - Sample 2 - (88.48 KB)
    Uploaded: 2/9/2015
  • NC Site Inspection Request - (44.13 KB)
    Uploaded: 2/9/2015
  • NC Open Wall Checklist - (134.50 KB)
    Uploaded: 2/9/2015
  • Administrative
  • NC Partner Checklist V4-V6 - (163.89 KB)
    Uploaded: 3/16/2016
    Guidance on what information and which documents are required for each submittal.

Guidelines

  • Estimated Incremental Cost Guidelines V6 - (494.95 KB)
    Uploaded: 2/9/2015
  • NC Technical Requirements V6 (2007 Baseline) - (138.04 KB)
    Uploaded: 1/21/2015
  • NC Technical Requirements V6 (2010 Baseline) - (154.44 KB)
    Uploaded: 1/21/2015
  • NC Program Guidelines V6 (2007 Baseline) - (2.66 MB)
    Uploaded: 2/9/2015
  • NC Program Guidelines V6 (2010 Baseline) - (2.19 MB)
    Uploaded: 2/9/2015
  • Changes to NC Technical Requirements V6 (2010 Baseline) - (74.91 KB)
    Uploaded: 2/9/2015
  • Program Guidelines Amendment - Lighting - (114.27 KB)
    Uploaded: 1/14/2016
  • NC Compliance Pathway Chart - (310.74 KB)
    Uploaded: 2/20/2017
    This document explains the ASHRAE baseline and performance target your project will be using.

Performance Path

  • Baseline Cost Estimator V6 - (238.18 KB)
    Uploaded: 2/9/2015
  • NC Energy Reduction Plan Tables V6 (2007 Baseline) - (775.99 KB)
    Uploaded: 2/9/2015
  • Baseline Cost Estimator SAMPLE V4 - (398.50 KB)
    Uploaded: 3/12/2015
  • NC Energy Reduction Plan Tables V6 (2010 Baseline) - (656.51 KB)
    Uploaded: 8/20/2015

Prescriptive Path

  • Placeholder - (11.25 KB)
    Uploaded: 2/17/2015

Modified Prescriptive Path

  • NC Modified Prescriptive Path Requirements V6 (2007 Baseline) - (249.61 KB)
    Uploaded: 2/9/2015
  • Changes to Modified Prescriptive Path Requirements V6 (2007 Baseline) - (70.74 KB)
    Uploaded: 2/9/2015
  • NC Modified Prescriptive Path Calculator V6 (2007 Baseline) - (1.67 MB)
    Uploaded: 5/29/2015
  • Changes to Modified Prescriptive Path Requirements V6 (2010 Baseline) - (77.13 KB)
    Uploaded: 6/5/2015
  • NC Modified Prescriptive Path Requirements V6 (2010 Baseline) - (623.58 KB)
    Uploaded: 8/27/2015
  • NC Modified Prescriptive Path Calculator V6 (2010 Baseline) - (1.68 MB)
    Uploaded: 8/31/2015

Data Release Authorization Forms

  • Addendum #4 Process - (859.71 KB)
    Uploaded: 12/17/2015
  • Utility Data Release Authorization Form - Tenant - (358.81 KB)
    Uploaded: 7/9/2018
    This release form is required for projects where utilities are direct metered to residents, and individual account data is used. This form is not applicable to projects using aggregated ConEd data pulls
  • Utility Data Release Authorization Form - Owner - (317.79 KB)
    Uploaded: 7/9/2018
    This Owner DRAF allows NYSERDA to pull customer data for 10 years after program participation. It includes language that supersedes the data pull timelines in the Terms and Conditions form.
  • Program Clarification
  • Program Guidelines Clarification - Master Metering - (77.60 KB)
    Uploaded: 2/9/2015
    Issued May 2012
  • NC Program Guidelines Addendum - Apartment Ventilation - (84.95 KB)
    Uploaded: 2/9/2015
    This Program Guidelines addendum clarifies current policy regarding apartment ventilation.

 

New Construction V5

Application

  • NC Project Information Form - (85.11 KB)
    Uploaded: 2/9/2015
  • NC Terms and Conditions - (137.83 KB)
    Uploaded: 2/9/2015
  • W-9 - (257.20 KB)
    Uploaded: 2/9/2015
  • NC Eligibility Flowchart & Decision Trees - (187.07 KB)
    Uploaded: 1/20/2015
  • Electronic Funds Transfer (EFT) Form - (223.60 KB)
    Uploaded: 4/2/2015
  • Construction
  • NC Inspection Request Form - Sample 1 - (81.33 KB)
    Uploaded: 2/9/2015
  • NC Inspection Request Form - Sample 2 - (88.48 KB)
    Uploaded: 2/9/2015
  • NC Open Wall Checklist - (134.50 KB)
    Uploaded: 2/9/2015
  • NC Site Inspection Request - (44.13 KB)
    Uploaded: 2/9/2015

Administrative

  • NC Partner Checklist V4-V6 - (163.89 KB)
    Uploaded: 3/16/2016
    Guidance on what information and which documents are required for each submittal.

Guidelines

  • Estimated Incremental Cost Guidelines V5 - (569.79 KB)
    Uploaded: 2/9/2015
  • Technical Requirements V5 - (91.55 KB)
    Uploaded: 2/9/2015
  • NC Program Guidelines V5 - (4.09 MB)
    Uploaded: 2/9/2015
  • Program Guidelines Amendment - Lighting - (114.27 KB)
    Uploaded: 6/17/2015
  • NC Compliance Pathway Chart - (310.74 KB)
    Uploaded: 2/20/2017
    This document explains the ASHRAE baseline and performance target your project will be using.

Performance Path

  • Baseline Cost Estimator V5 - (433.00 KB)
    Uploaded: 2/9/2015
  • NC Energy Reduction Plan Tables V5.01 - (842.35 KB)
    Uploaded: 12/29/2014
  • Baseline Cost Estimator SAMPLE V4 - (398.50 KB)
    Uploaded: 3/12/2015
  • NC Energy Reduction Plan Tables V5.01 (ASHRAE 2010 Baseline) - (667.41 KB)
    Uploaded: 8/31/2015
  • Prescriptive Path
  • Prescriptive Path Calculator V5 - (265.46 KB)
    Uploaded: 2/9/2015
  • Modified Prescriptive Path
  • Modified Prescriptive Path Requirements V5 - (236.88 KB)
    Uploaded: 2/9/2015
  • Modified Prescriptive Path Calculator V5 - (1.85 MB)
    Uploaded: 6/1/2015

Data Release Authorization Forms

  • Addendum #4 Process - (859.71 KB)
    Uploaded: 12/17/2015
  • Utility Data Release Authorization Form - Tenant - (358.81 KB)
    Uploaded: 7/9/2018
    This release form is required for projects where utilities are direct metered to residents, and individual account data is used. This form is not applicable to projects using aggregated ConEd data pulls
  • Utility Data Release Authorization Form - Owner - (317.79 KB)
    Uploaded: 7/9/2018
    This Owner DRAF allows NYSERDA to pull customer data for 10 years after program participation. It includes language that supersedes the data pull timelines in the Terms and Conditions form.

Program Clarification

  • Program Guidelines Clarification - Master Metering - (77.60 KB)
    Uploaded: 2/9/2015
    Issued May 2012
  • NC Program Guidelines Addendum - Apartment Ventilation - (84.96 KB)
    Uploaded: 2/9/2015
    This Program Guidelines addendum clarifies current policy regarding apartment ventilation.

 

New Construction V4

Application

  • Electronic Funds Transfer (EFT) Form - (223.60 KB)
    Uploaded: 4/2/2015
  • Construction
  • NC Inspection Request - Sample 1 - (81.33 KB)
    Uploaded: 2/9/2015
  • NC Inspection Request - Sample 2 - (88.48 KB)
    Uploaded: 2/9/2015
  • NC Photo Template - (171.50 KB)
    Uploaded: 2/9/2015
  • NC Open Wall Checklist - (134.50 KB)
    Uploaded: 2/9/2015
  • NC Site Inspection Request - (44.13 KB)
    Uploaded: 2/9/2015
  • NC Testing & Verification Protocols V4.1 - (481.81 KB)
    Uploaded: 8/4/2016

Administrative

  • NC Partner Checklist V4-V6 - (163.89 KB)
    Uploaded: 3/16/2016
    Guidance on what information and which documents are required for each submittal.
  • Guidelines
  • NC Program Guidelines V4.2 - (309.06 KB)
    Uploaded: 2/9/2015
  • NC Simulation Guidelines V4 - (261.73 KB)
    Uploaded: 2/9/2015
  • NC Estimated Incremental Cost Guidelines V4 - (397.54 KB)
    Uploaded: 2/9/2015
  • Program Guidelines Amendment - Lighting - (114.27 KB)
    Uploaded: 6/17/2015

Performance Path

  • NC ERP Tables V4.2p - (1.82 MB)
    Uploaded: 2/9/2015
  • Simulation Guidelines Appendix, Version 4 - (521.78 KB)
    Uploaded: 2/9/2015
  • NC4 Baseline Cost Estimator - (438.50 KB)
    Uploaded: 2/9/2015
  • NC4 Baseline Cost Estimator SAMPLE - (398.50 KB)
    Uploaded: 2/9/2015
  • Prescriptive Path
  • NC Prescriptive Path Requirements V4.1 - (156.59 KB)
    Uploaded: 2/9/2015
  • NC Prescriptive Path Calculator V4.1 - (1.42 MB)
    Uploaded: 2/9/2015

Data Release Authorization Forms

  • Addendum #4 Process - (859.71 KB)
    Uploaded: 12/17/2015
  • Utility Data Release Authorization Form - Owner - (317.79 KB)
    Uploaded: 7/9/2018
    This Owner DRAF allows NYSERDA to pull customer data for 10 years after program participation. It includes language that supersedes the data pull timelines in the Terms and Conditions form.
  • Utility Data Release Authorization Form - Tenant - (358.81 KB)
    Uploaded: 7/9/2018
    This release form is required for projects where utilities are direct metered to residents, and individual account data is used. This form is not applicable to projects using aggregated ConEd data pulls

Minimum Performance Standards

  • NC Minimum Performance Standards V4.1 - (177.42 KB)
    Uploaded: 2/9/2015
  • NC Minimum Performance Standard Checklist V4.1 - (259.00 KB)
    Uploaded: 2/9/2015
  • NC Minimum Performance Standard Checklist V4 - SAMPLE - (283.20 KB)
    Uploaded: 2/9/2015
  • NC Minimum Performance Standard Waiver Template - (19.88 KB)
    Uploaded: 2/9/2015

Program Clarification

  • Program Guidelines Modification - V4 Incentive Request Processing - (102.06 KB)
    Uploaded: 2/9/2015
    Issued January 2012
  • Program Guidelines Clarification - Master Metering - (77.60 KB)
    Uploaded: 2/9/2015