BACK TO Megawatt (MW) Block Dashboards

Residential and Small Commercial Dashboard

NYSERDA offers incentives for the installation of new grid-connected solar electric systems up to 200 kW (and up to 500 kW for small commercial projects in the PSEG-LI region), that offset the use of grid-supplied electricity. Solar electric systems must be sized primarily to serve project load.

The MW block approach allocates megawatt targets to specific regions of the State, breaks those targets into blocks, and assigns incentives per block. Incentives are awarded based on the block in affect at the time of submission. Once all blocks within a region/sector are fully subscribed, the incentive is no longer available to that region/sector.

When viewing the dashboard, hold your cursor over a column in any chart to get the block details such as block open or closed, the total number of MW and the incentive assigned to the block, and the percentage of the block still available for applications. If you have trouble viewing the dashboard on this page. If you have trouble viewing the dashboard on this page, try launching it in a new windowLink opens in new window - close new window to return to this page..

This dashboard provides real time information on the status of blocks and current incentive levels by sector and region. Block status is updated as applications are submitted, so click the refresh button below (not in your browser) to see the current status.