Hidden Image

Arverne East - Building I

Queens County

Queens highlighted on a map of New York State over a green and white bokeh dot background.
Arverne East - Building I - Multifamily Buildings of Excellence Winner Arverne East - Building I - Multifamily Buildings of Excellence Winner

Arverne East - Building I

3541 Shore Front Parkway, Far Rockaway, NY

7 Stories

72 Affordable units

116,857 Total sq ft.

  • New Construction
  • Anticipated Completion: 2031
  • Total project cost: $71,767,894
  • Total project cost per sq ft: $614
  • Award: $1,500,000
  • PHI Classic Certfication
  • Enterprise Green Communities
  • ENERGY STAR
  • Multifamily New Construction
  • Fitwel

Project Description

Arverne East – Building I is a 116,857 square foot, 72-unit affordable housing development providing resilient, equitable, and climate-forward design. Featuring ground source heat pumps, solar photovoltaic system and a small wind turbine to complement off-solar production periods and district geothermal battery storage. The project will also include a building management system, a high-performance envelope, centralized energy recovery ventilators, electric vehicle charging stations that will include charging stations for e-bikes and e-scooters. Situated on the Rockaway Peninsula’s oceanfront, the building is designed with full recognition of its coastal environment including bioswales, and permeable pavements, buffer waves that filter pollutants, recharge the aquifer, and create pollinator habitat and outdoor classrooms. As part of the 116-acre Arverne East master plan, it leverages the scale of a district clean energy campus and the ingenuity of biomimicry to deliver a replicable model for low-carbon, community-centered housing.

Project Status: Schematic Design

Market Sector: Mid-Rise Multifamily

Developed by: The Bluestone Organization and MEGA Contracting Group

Designed by: Ettinger Engineering Associates

Notable Technical Attributes

Resilience, Passive and Active Survivability 

Site Features