NY.gov Portal State Agency Listing Search all of NY.gov
Print

Portable Emergency Generator Program

Governor Andrew M. Cuomo launched the “Fuel NY” initiative, an integrated solution to ensure that New Yorkers have access to gasoline in a severe storm or other major weather event. In fulfillment of a commitment made by the Governor in his 2013 State of the State address, the program was developed as a direct response to Superstorm Sandy, and includes the nation’s strongest back-up power requirements for gas stations in strategic locations.

The Fuel NY initiative should provide first responders, essential personnel, evacuating residents and other motorists with peace-of-mind knowing that gas stations have the necessary back-up power capacity to distribute gasoline and get things back to normal as quickly as possible after a major storm.

Additionally, a new website at stormrecovery.ny.gov/fuel-nyLink opens in new window - close new window to return to this page. has been created to provide information for both gas station owners and motorists identifying which gas stations are required to participate in the program. The site will be updated regularly to show which stations are equipped with back-up power capacity.

Approximately half of all downstate gas stations in New York City, Long Island and Westchester and Rockland counties are now required to have back-up power in the event of an emergency.

  • Stations within a half-mile of a highway exit or hurricane evacuation route in these downstate areas will need to be wired with a transfer switch by April 1, 2014. They must deploy and install a generator within 24 hours of losing power in an emergency.
  • In addition, 30 percent of all retail outlets that are part of a chain further than half-mile from highway exits and evacuation routes in these downstate areas will be required to install a transfer switch by August 1, 2015. They must deploy and install a generator within 48 hours of losing power.
  • All newly constructed gas stations in New York City, Long Island, Westchester and Rockland counties for which a building permit is issued on or after April 1, 2014 will be required to have wiring to deploy a generator or have a back-up generator installed.
  • Gas stations selling less than 75,000 gallons of fuel per month are exempt.

Gas stations can apply for funding online. For help with the application process, station owners can call 1-855-452-4859 or send an email to PEGprogram@nyserda.ny.gov.

Last Updated: 09/23/2014
Callout Top
Arrows

How To Apply

Callout Bottom
Callout Top
Checkbox

Who Can Participate

Gas stations located in a designated strategic locationLink opens in new window - close new window to return to this page. to ensure critical stations have back-up power.

Callout Bottom
Callout Top
contact

Who To Contact

Contact the Portable Emergency Generator Program team at: 

PEGprogram@nyserda.ny.gov
or 1-855-452-4859

Callout Bottom