File Not Found
Sorry, the page you are looking for has either been moved to another location, or, has been deleted.
It is possible that one of the following pages is the one you're looking for:
- PON 2439 On-Site Wind Turbine Incentive Program
NYSERDA announces the availability of approximately $13.8 million in incentives to encourage the installation of end-use wind energy systems for residential, commercial, institutional or government use. The incentives, of up to $400,000 per site/customer, will be paid to Eligible Installers who install new approved grid-connected wind energy systems using qualified equipment, in accordance with the eligibility requirements described below. The maximum equipment size shall be 2 MW (2,000 kW) per site/customer. NYSERDA’s incentive shall not exceed 50% of the total installed cost of the system. The program will continue through December 31, 2015 or until funds are fully committed, whichever comes first.
www.nyserda.ny.gov/Funding-Opportunities/Current-Funding-Opportunities/PON-2439-On-Site-Wind-Turbine-Incentive-Program.aspx
Last Modified: 5/14/2013
You can also try one of these methods:
- Using the Search function at the top-right of this page, or
- Visit the Site Map
If you need further assistance, please call 1-866-NYSERDA.
Last Updated: 06/07/2013