File Not Found



Sorry, the page you are looking for has either been moved to another location, or, has been deleted.

It is possible that one of the following pages is the one you're looking for:

  • Microturbine/CHP Demonstration
    Two natural gas-fueled GE-Honeywell Parallon 75 microturbines with recuperators and heat recovery equipment will be installed at the New York Marriott Marquis hotel in midtown Manhattan.
    www.nyserda.ny.gov/About/Publications/Case-Studies-and-Features/Combined-Heat-and-Power-Case-Studies/Success-Stories/Microturbine-Project
    Last Modified: 4/16/2015

You can also try one of these methods:

  • Using the Search function at the top-right of this page, or
  • Visit the Site Map

If you need further assistance, please call 1-866-NYSERDA.