Make Your Multifamily Building More Energy Efficient

Take advantage of incentives, low-interest loans, and technological expertise for bottom-line savings

As the owner of an existing building of 5+ units and 4+ floors, you can save substantially on monthly energy costs by participating in NYSERDA’s Multifamily Performance Program for Existing Buildings — a marquee part of our Multifamily Energy Performance Portfolio.

Through a partner network of engineers, energy consultants, and other industry professionals, the program applies the latest in building science technology to your existing building's design and daily operation, showing you how to save substantially on energy costs.

To participate, you’ll work with your selected Performance Partner to conduct a whole-building assessment that looks for energy-saving potential. The resulting Energy Reduction Plan will set a performance target for your building, and detail specific recommendations to achieve them. As you implement your Energy Reduction Plan and achieve its energy goals for your building, you will be eligible for NYSERDA incentives.

The fastest way to get started is to find a Multifamily Performance Partner.

Find MPP Project Near You

How your building will benefit

  • Save on annual energy costs—potentially hundreds of thousands of dollars
  • Protect yourself against future volatility of energy costs
  • Provide tenants with a comfortable and affordable living environment

Financial Incentives

Existing Buildings - Maximum Incentives

Project Type Firm Gas (per unit) Non-Firm Gas (per unit)
Affordable $1,000 $800
Market Rate $700 $500

A project's incentive may be reduced based on the cost and/or cost-effectiveness of the recommended upgrades.

Additional Performance Payment

Existing buildings that project at least 20% energy reduction in the Energy Reduction Plan may also be eligible for an additional Performance Payment in accordance with the table below.

Tier Performance Payment (per unit)
Tier #1 - 20%-22% $150
Tier #2 - 23%-25% $200
Tier #3 - 26%-28% $250
Tier #4 - 29%+ $300

Existing Buildings - Incentive Payment Schedule

The following incentive payment schedule detail the specific payment of a project's base incentive.

Stage 1 - Upon approval of the project's Energy Reduction Plan

Project Size Affordable Firm Gas (per unit) Affordable Non-Firm Gas (per unit) Market Rate Firm Gas (per unit) Market Rate Non-Firm Gas (per unit)
Fast Track 5-49 units N/A N/A N/A N/A
Standard Path 5-49 units $100 $80 $70 $50
Standard Path 50 units & up N/A N/A N/A N/A

 

Stage 2 - Upon inspection of at least 50% of the installed upgrades

Project Size Affordable Firm Gas (per unit) Affordable Non-Firm Gas (per unit) Market Rate Firm Gas (per unit) Market Rate Non-Firm Gas (per unit)
Fast Track 5-49 units N/A N/A N/A N/A
Standard Path 5-49 units $400 $320 $280 $200
Standard Path 50 units & up $500 $400 $350 $250

 

Stage 3 - Upon inspection of 100% of the installed upgrades

Project Size Affordable Firm Gas (per unit) Affordable Non-Firm Gas (per unit) Market Rate Firm Gas (per unit) Market Rate Non-Firm Gas (per unit)
Fast Track 5-49 units $1000 $800 $700 $500
Standard Path 5-49 units $500 $400 $350 $250
Standard Path 50 units & up $500 $400 $350 $250

Financing below the market rate

Financing for multifamily energy upgrades is more affordable through Green Jobs – Green New York, which advances 50 percent of the principal borrowed directly to your lender at an interest rate of 2%, effectively reducing the cost of your loan (up to $1 million) below the market rate. Green Jobs – Green New York can contribute up to $5,000 per unit or up to $500,000 per project. Read more about Green Jobs – Green NY for multifamily buildings.

What’s the best deal: deciding between NYSERDA programs and utility company programs

Some utility companies offer programs specifically for multifamily buildings; some do not. We recommend that you carefully compare the benefits of working with a utility company program and the NYSERDA Multifamily Performance Program. You must choose one or the other. NYSERDA takes a whole-building approach and creates incentives based on energy savings; utility companies tend to offer rebates on specific improvements or upgrades. Utility companies are generally restricted to working with building of 75 units or less; there is no upper size limit for working with NYSERDA.

Contact your utility company directly or check out following web sites to help you decide:


Case Study

  • AC Lofts – This 91-unit apartment complex was originally home to Buffalo's historic Alling and Cory paper warehouse. Now it's a thriving modern living space, complete with comprehensive energy efficiency upgrades including newly insulated walls and roofing, improved lighting and fixtures, motion sensors, water source heat pumps and energy-efficient appliances and motors. Since the renovation, the building has cut energy usage by an impressive 32 percent. And if that wasn't enough of a testament to its success, the complex has also garnered several awards for its role in the revitalization of downtown Buffalo. Download the full AC Lofts case study [PDF].
  • Rose May Manor – Guy Demascole first purchased this Pulaski, NY apartment complex in total disrepair. However, a comprehensive rehabilitation project, including energy efficiency upgrades through NYSERDA’s Multifamily Performance Portfolio, transformed the property into a high-demand tenant destination. Taking advantage of over $98,000 in incentives and financing for the balance, Demascole made full-scale energy upgrades that slashed the building’s energy usage by 39%. Now, tenants enjoy low energy costs and high-quality of living – which, in turn, has generated a significant word-of-mouth effect.
  • Carnegie House – The mechanical systems in this 21-story Manhattan co-op building needed an across-the-board update. Rather than simply replacing equipment, the building’s management and board decided to invest in a comprehensive energy upgrade project, creating more than $139,000 in annual cost savings. Download the full Carnegie House case study. Download the full Carnegie House case study [PDF].
  • Riverview Court – This 343-unit affordable housing building needed an across-the-board update. By replacing aging windows, lighting and refrigerators and making other upgrades such as air sealing and installing electricity submeters, Riverview Court cut its energy costs by more than $300,000 a year. Download the full Riverview Court case study [PDF].
  • Trump Tower at City Center – Just a few years after this White Plains high-rise was built, residents saw energy bills that were dramatically higher than expected. After completing a comprehensive energy upgrade project that improved lighting and added a combined heat and power unit, the building slashed energy use by 21 percent.
  • Grant Village Apartments – Three dated, failing atmospheric boilers for 520 apartments across 45 buildings were upgraded to a decentralized approach that saved 25 percent and $293,643 in electricity and natural gas costs for this complex in Syracuse. Download the Grant Village case study [PDF].
  • Saranac Lake Building – The mixed-use residential and commercial building at 135 Broadway in Saranac Lake turned around a long period of deferred maintenance and high energy bills with a comprehensive plan that cut energy use by 27 percent and delivered annual savings of $6,495. Projected payback time: 6.8 years. Download the Saranac Lake case study [PDF].
  • Colvin Avenue Apartments – This two-story building in Buffalo, with 12 units, suffered from a variety of air-infiltration woes in addition to an aging central steam boiler and radiators with quirky controls. A comprehensive Energy Reduction Plan resulted in 40 percent energy savings in both electricity use and natural gas. In addition to upgrades to the building envelope and heating plant, a variety of health and safety issues were addressed. Here’s a quick look at the project, with before and after photosLink opens in new window - close new window to return to this page..
  • Phipps Garden Apartments – This two-building Queens apartment complex was required to upgrade its #6 oil-burning boiler. Rather than do the minimum, Phipps Garden Apartments’ management invested in a comprehensive energy upgrade project, earning more than $300,000 in incentives and an annual energy savings of nearly $180,000. Phipps Garden Apartments case study [PDF].

Last Updated: 09/23/2014
Callout Top
Arrows

How to Apply

Callout Bottom
Callout Top
Checkbox

Who is Eligible

  • Buildings must contain five or more units with at least four floors.
  • At least 50 percent of the building’s gross heated footage must be residential space; the remaining space can be nonresidential-related commercial space.
  • Must pay into SBC
  • NYSERDA incentives cannot be combined with incentives or rebates from utility company programs.
  • Buildings that have received incentives or rebates from other programs are not eligible for NYSERDA support for 12 months after receipt of payment.